Got the right guard off the truck and fixed the rust just above the headlight, It was fixed with bog by someone so i needed to put steel in the hole.
I took the door hinges to work to put in new pins as the doors had to much movement .
i got an email the other day with a nice photo of the motor on the gearbox,
the motor and gearbox fit together so well it only needed a 1mm spacer on the bolts between the gearbox and the bellhousing
and the drive keyed onto the motor(right) spline on the gearbox (left)
No comments:
Post a Comment